Has had experience in various local Companies including Kenya Airports Authority and KPLC. Upon graduation, he was absorbed by ARM in 2013 and has since then been involved in installation and commissioning of both Medium and High Voltage Substations as assigned by ARM. His major assignments within the last two years include:Makutano 132/33kV Substation, Shinyanga 220 KV substation, Singida 220KV substation, Kiyungi 132/33KV substation, Lukenya 66/11 KV substation, Ruaraka 66/11kV Reactive Power Compensator and 11MVA Power Transformer,66/11kV Switchyard in 81MW HFO Athi River Power Plant, Kitale 132/33 KV substation, Namugongo 33/11 KV GIS substation, Moniko33/11 KV Substation, Sagana Kutus 132/33 KV substation.
He is proficient in the following protection relays testing and commissioning:
He is proficient in the following protection relays testing and commissioning:
- ABB: 670 Relion series,650 Relion series,630 series,615 series for substation protection.
- SIEMENS: 7SA522,7UT613,7SD52.
- ALSTOM: P546, P441.
- VAMP: 210,265.
- GENERAL ELECTRIC: 489 generator protection.
- SEL: 311L,421
- NARI RELAY: P902, P915, P9611
- EFFACEC: BCU 500, TPU S420, TPU S 430, TPU S220
- MS project.
- AutoCAD
- Etap
- Relay softwares: PCM 600, Digsi, ACselerator, Winprot, Automation Studio and Micom